• Skip to main content
itrc_logo

Managed Aquifer Recharge

MAR Home
About ITRC
Navigating this Website
1 Introduction
1 Introduction Overview
1.1 What Is MAR?
1.2 Purpose/Scope of MAR Guidance
1.3 Key Terms and Definitions
1.4 State Survey Results
1.5 Document Organization
2 Project Planning
2 Project Planning Overview
2.1 Project Team
2.2 Feasibility
2.3 Economics
2.4 Stakeholder Engagement and Environmental Justice
2.5 Regulatory Considerations and Permitting
2.6 Pilot Testing
2.7 Operations, Maintenance, and Monitoring (OM&M
3 Managed Aquifer Recharge
3 Managed Aquifer Recharge Overview
3.1 Intended Use of MAR
3.2 Source Water
3.3 Receiving Aquifer
3.4 Recharge Technologies
3.5 Water Quality Considerations
3.6 Data and Modeling
4 Recharge Technologies 
4 Recharge Technologies Overview
4.1 Surface Recharge Technologies Overview
4.2 Subsurface Recharge Technologies Overview
Recharge Technology Fact Sheets
Infiltration Basin Fact Sheet
Retention Structures Fact Sheet
Injection Well Fact Sheet
Dry Well Fact Sheet
Infiltration Gallery Fact Sheet
5 Case Studies
5 Case Studies Overview
5.1 HRSD Sustainable Water Initiative for Tomorrow (SWIFT) Program
5.2 Using a Simple, Low-Cost Injection Water Pretreatment System to Reduce the Concentration of Naturally Occurring Arsenic and Other Trace Metals in Recovered Water during ASR Operations 
5.3 Seawater Intrusion/Replenishment in Southern Los Angeles County 
5.4 San Antonio Water System H2Oaks Center ASR Project 
5.5 Salinas Valley Groundwater Basin 
5.6 Idaho’s Eastern Snake Plain Aquifer MAR Program 
5.7 Pilot Study for the Injection of Highly Treated Reclaimed Water to Create Saltwater Intrusion Barriers and Enhance Groundwater Supplies, Hillsborough County, Florida 
5.8 Mustang Creek Watershed Dry Well Pilot Study  
5.9 Walla Walla Basin Watershed 
5.10 Clark Fork River Basin MAR Modeling 
5.11 Army Post Road ASR Well 
5.12 South Metro Water Supply Authority Regional ASR Groundwater Model Scope of Work 
References
Appendices
APPENDIX A. Managed Aquifer Recharge (MAR) Team State Survey 
Appendix B. Water Quality Parameters
APPENDIX C. State, Territory, and Tribe Contacts for Managed Aquifer Recharge
Appendix D. Team Contacts 
Appendix E. Glossary
Appendix F. Acronyms
Acknowledgments
Document Feedback

 

Managed Aquifer Recharge
HOME

5.9 Walla Walla Basin Watershed 

Author: Maria Daugherty 

Site Name: Walla Walla Basin Watershed Council 

Location: Walla Walla River Watershed located in Washington and Oregon  

Operators: Walla Walla Basin Watershed Council (WWBWC), Hudson Bay District Improvement Company, Fruitvale Water Users Association, and Walla Walla River Irrigation District.  

Permitting Agencies: Oregon Department of Water Resources and Washington Department of Ecology 

Current MAR Status: Active 

Year Constructed: 2004  

Costs: $10,000/year for the operation and maintenance of all Oregon recharge sites 

Project Contact Information: Walla Walla Basin Watershed Council (541-938-2170) 

Project Website/Publication Links:  

https://wwbwc.org/index.php/recharge#anspach

Purpose of MAR:  

  • Water supply resilience  
  • Protection of riparian ecosystems/maintenance of minimum streamflow 
  • Resilience/climate adaptation 

Source Water: 

  • Rivers/streams/lakes/reservoirs  

Water Quality: 

  • No treatment required 

Recharge Technology:  

  • Infiltration basin 
  • Infiltration gallery  

Project Description  

Aquifer and watershed boundaries rarely follow political borders, yet political borders often dictate the occurrence of MAR locations. In the Walla Walla watershed, collaboration among landowners, state agencies, and others helped the Walla Walla Basin Watershed Council (WWBWC) develop an effective bi-state recharge project to enhance the Walla Walla River. The WWBWC works to protect the Walla Walla River system, which is located in northeast Oregon and southeast Washington. An underlying alluvial aquifer maintains a high degree of hydraulic connectivity to the streams on the valley floor and generally follows a predictable path from east to west but is a transboundary watershed shared by the states of Oregon and Washington (Figure 1). 

Figure 1. Distributary stream network of the Walla Walla River, which is a transboundary watershed shared by the states of Oregon and Washington.  

Source: WWBWC (2020)  

An increase in development caused water levels in the Walla Walla River to drop, which degraded habitat conditions for steelhead and bull trout, ultimately resulting in both species being categorized as threatened under the Endangered Species Act. Although initial measures were taken to recover streamflow conditions, with irrigators agreeing to leave surface water in the river, streamflows were still insufficient for aquatic life. In addition to restoring lost floodplain function due to channelization and flood control, it was determined that groundwater mitigation was required to achieve river restoration, as it was estimated that seepage loss to groundwater along some stretches of the river was greater than 30% (Figure 2).  

Figure 2. Average gains or losses in flow of a segment of the Walla Walla River during seepage runs conducted 2004–2016. Gains (positive values are greens and yellows) indicate groundwater discharging to the river. Losses (negative values are reds and oranges) indicate surface water seeping into the ground. 

Source: WWBWC (2017) 

The WWBWC created an aquifer recharge project to address declining groundwater conditions; however, since the watershed and alluvial aquifer cross state borders, it became apparent that a bi-state approach would increase ecological benefits gained through multiple MAR locations (Figure 3). A total of 19 recharge projects have been implemented throughout the Milton-Freewater alluvial fan via infiltration galleries and ponds designed to recharge the aquifer. From 2004 to 2020, approximately 85,000 acre-feet of recharge volume has been added into the Walla Walla Basin from the Oregon MAR project (Figure 4).  

Figure 3. Recharge locations of the WWBWC. 

Source: WWBWC (2023) 

Figure 4. Cumulative recharge volume of the Oregon Walla Walla Basin MAR project (14 recharge sites). 

Source: WWBWC (2020)  

Currently, the sites are operated under a limited license issued by the Oregon Water Resources Department. Recharge operations in Washington are on hold due to various issues, such as maintenance to prevent clogging, grant money tied directly to fish habitat restoration (rather than MAR operations), and the changing of property ownership. When Washington recharge sites are in operation, the Washington Department of Ecology will oversee water quality criteria.  

The variation in recharge water volume greatly depends on water availability and landowner participation; although some sites contribute relatively small portions to the aquifer, they were designed to recharge the alluvial aquifer via conveyance losses from open ditches when delivering water to the sites (Figure 5). Source water for 14 aquifer recharge sites in Oregon was obtained from the Walla Walla River in Milton-Freewater, Oregon, under a limited license agreement with the Oregon Water Resources Department and delivered throughout existing irrigation delivery systems to each site’s turnout.  

Figure 5. Recharge volumes by site during water year 2020. 

Source: WWBWC (2020) 

The Johnson site (Figure 6) is the largest recharge location, constructed in 2004, and includes 10 spreading basins and three active infiltration galleries. The site was developed under a phased approach that involved the initial construction of the infiltration basins, with the final phase including the addition of infiltration galleries (Figure 7). The four different infiltration gallery designs were installed to create a cost-benefit analysis of the different design types to determine each design’s longevity. From 2004 to 2020, the Johnson site has recharged over 51,000 acre-feet.  

Figure 6. The Johnson Aquifer recharge site. 

Source: WWBWC (2023). 

Figure 7. Phased approach of MAR at the Johnson site. 

Source: WWBWC (2023)  

Lessons Learned 

Groundwater declines in the Walla Walla Basin have caused springs and domestic wells to dry up and have produced a steep gradient of seepage losses from the numerous hydraulically connected streams and rivers on the valley floor. In addition to restoring floodplain function lost with channelization and flood control, Walla Walla’s MAR project is a vital tool in the suite of restoration actions needed to improve in-stream flows and aquatic habitat for threatened and endangered native fish species.   

Other Considerations 

Considering the volumes of recharge versus achieving project success requires analysis of many factors, including realistic timelines. For example, the WWBWC 2013 Aquifer Recharge Strategic Plan stated that the following benefits were expected if annual volume recharged reached 20,000 acre-feet:  

“Reversing the loss of storage within the alluvial aquifer will minimize seepage loss in the valley’s rivers and streams, increase spring performance and related groundwater input to surface water features, and allow groundwater resources of the alluvial aquifer to continue to be used as a sustainable resource with a secondary or alternative-use benefit to surface water.” (WWBWC 2013, p. 79). 

To date, the target volume has not yet been achieved (Figure 4); however, the foundational structure exists to achieve this goal, because collaboration among the WWBWC, state agencies, landowners, and other stakeholders in the watershed is in place to meet demand, while utilizing MAR to continue improving ecological conditions. The foundational structure of collaboration, especially in a transboundary watershed, is paramount to achieving measured success. 

image_pdfPrint this page/section
MAR Full PDF
glossaryGlossary
referencesReferences
acronymsAcronyms
ITRC
Contact Us
About ITRC
Visit ITRC
social media iconsClick here to visit ITRC on FacebookClick here to visit ITRC on TwitterClick here to visit ITRC on LinkedInITRC on Social Media
about_itrc
Permission is granted to refer to or quote from this publication with the customary acknowledgment of the source (see suggested citation and disclaimer). This web site is owned by ITRC • 1250 H Street, NW • Suite 850 • Washington, DC 20005 • (202) 266-4933 • Email: [email protected] • Terms of Service, Privacy Policy, and Usage Policy ITRC is sponsored by the Environmental Council of the States.